Built for the wheelchair, the walker, the stroller, and the hand truck that all use the same six feet of concrete every day.
Watch your front entrance for twenty minutes on a Tuesday. A delivery driver pushes a loaded hand truck up the ramp and pauses at the top to get the door. Somebody with a walker takes it slowly and needs the landing to be genuinely flat before they can reach the handle. A parent swings a stroller wide around the bottom flare. All of them are using the same slab, and every one of them feels a quarter inch of settlement that you stopped noticing years ago.
That's the standard we build to. Not just a set of numbers on a plan, but a ramp that works in February when it's icy, works when both hands are full, and works for the person who has the least margin. Castle Rock has plenty of older commercial frontage where the ramp was added later and it shows.
Buildings around Plum Creek and older stretches of Founders Village were built before accessibility was designed in, so the ramp was cut into an existing walk later. Those retrofits usually pass on paper and fail in use. The run is right but the landing pitches, or the ramp meets a door that swings out over it, or the bottom dumps straight into a gutter pan that ponds.
Newer property near Metzler Ranch and Crystal Valley has cleaner geometry and a different problem: settlement. A ramp poured on ground that was never compacted underneath will drift out of tolerance within a few winters, and a compliant ramp that settles two percent is no longer a compliant ramp. That's the call we get most often, and it's a real one.
| Element | What we build to | What happens when it's off |
|---|---|---|
| Running slope | No steeper than one inch of rise per twelve of run | A self-propelled chair can't hold the grade, and it ices into a slide |
| Cross slope | Two percent maximum across the walking surface | Chairs pull sideways, walkers lose balance, carts drift into the rail |
| Landings | Level pad at least sixty inches deep, top and bottom | Nobody can stop to open the door without rolling backward |
| Clear width | Thirty-six inches between rails or edges | A standard chair scrapes knuckles; a hand truck won't fit at all |
| Detectable warning | Truncated dome panel across the full width at the street edge | A cane user gets no notice before entering the drive aisle |
| Handrails | Both sides once the rise passes six inches, anchored into concrete | Rails work loose and become the hazard instead of the help |
| Surface texture | Light broom run across the direction of travel | Smooth troweled concrete turns into a slide the first cold morning |
A ramp is the part of your property most likely to be icy and most likely to hurt somebody when it is. Sitting above six thousand feet, Castle Rock runs through hard freeze cycles all winter, and a ramp catches sun differently than the flat walk beside it, so it melts and refreezes on its own schedule. Which is why we get fussy about two things: texture and drainage.
Broom texture goes across the walking direction, giving a wheel and a shoe something to bite. Drainage gets designed so meltwater sheets off the side rather than running down the slope and freezing at the bottom landing where everyone stops. And we build a ramp with the plow in mind, keeping the edges and flares clear of lips that a shovel or blade will catch and break.
We'll bring a smart level and check the slopes, landings, and warning panel, then tell you plainly what's out and what isn't.
Most of the ramps we replace serve the only accessible entrance a building has, so shutting it for a week isn't an option. We plan a temporary accessible route first, mark it clearly, and keep it usable through demo and cure. On some sites that means pouring in two halves. On others it means a weekend, with demo Friday evening and concrete Saturday morning.
Cure time is the piece owners underestimate. Foot traffic returns in a day or two, but we hold the route until the surface is genuinely ready; scuffing a green ramp with a loaded cart leaves marks nothing takes out.
Still unsure about something?
Call the crew at (303) 569-4046 and we will talk it through.
Get a free, no-obligation estimate from a crew that knows Colorado soil, Colorado weather, and how to finish concrete that lasts.