Industrial Floors & Docks in Colorado
For Property Managers, GCs & Boards

Commercial Industrial Floors & Docks

Flatness, joint filling, and approach slabs sized for forklifts and trailer landing gear.

Scope

Everything In This Scope

Each line below is a scope we bid, schedule, and pour ourselves. Open one for specifications, sequencing, and the questions worth asking before award.

Ask a warehouse manager where the floor is failing and they will point at a joint. Not the middle of a panel. The joint. Hard polyurethane wheels hammer joint edges thousands of times a shift, and once an edge chips, the next pass hits harder. The chip becomes a crater that rattles a mast, shortens the life of the truck, and eventually lands on your desk as a work order.

Floors, dock approaches, dumpster pads, and equipment pads are wear surfaces before they are anything else. Each gets designed around what rolls on it, drops on it, or sits on it vibrating. We build all four across the Front Range, usually inside buildings still receiving freight, so phasing matters as much as mix design.

6"common slab thickness where lift trucks run loaded
8"typical dock approach thickness for landing-gear loads
4,000 PSIair-entrained mix on exterior aprons and pads
28days to full design strength

Flatness is a number, and your racking cares about it

Floor flatness gets measured, not eyeballed. F-numbers describe how much a floor waves over a short distance and how far it drifts over a long one. They are the difference between a rack installer shimming a few base plates and one stopping to call you. Narrow-aisle equipment is the strict case: lift a load thirty feet up on a mast, and a small dip under the wheels becomes a large sway at the top.

So the target belongs in the spec before bid day. Ordinary tolerances cost less than a defined-traffic superflat floor, and there is no reason to buy the second one for a building storing pallets two levels high. But there is no fixing it afterward without grinding, which is loud, dusty, and slow in an occupied building.

We ask about the racking layout early, because aisle direction decides where the tight tolerance needs to fall.

Joints are where floors die

Concrete shrinks as it dries. It is going to crack. Joints exist so it cracks where we decided, which means saw cuts the same day at spacing matched to slab thickness. On a large interior pour, that means saws running through the night.

Then comes the part that gets skipped. An open control joint is a knife edge waiting for a wheel. Semi-rigid epoxy or polyurea filler installed full depth supports both shoulders so the wheel rolls across the joint rather than into it. Fill too early and the filler tears as the slab keeps shrinking. Never filling is worse. Where an edge has already spalled, we saw out the damage, patch back to a square shoulder, and refill. That outlasts troweling material into a chip by years.

Dowels at construction joints do the other half of the work. Load transfer is what keeps one panel from stepping down under a passing wheel.

Four surfaces, four different governing loads

What each pour is designed against, and the detail that decides how long it lasts
SurfaceThe load that governsThe detail that decides its life
Warehouse floorRolling wheel loads plus rack post point loadsFlatness tolerance and filled joints
Dock approachTrailer landing gear concentrated on two small padsThickness, reinforcement, and slope away from the building
Leveler pitThe pit walls and the frame anchored into themSquare, plumb walls and embedded angle set true
Dumpster padA loaded container plus the truck's front axle and forksLength past the container and a containment edge
Equipment padStatic weight plus continuous vibrationIsolation from the surrounding slab and stub-ups placed off shop drawings
Need a floor or dock rebuilt without shutting receiving down?

We will walk the building, take readings on what you have now, and hand back a phased plan with a written price. Free estimates. Call (303) 569-4046.

What we settle before pouring inside a working building

  • A phasing map showing which bays release, in what order, for how long
  • Temporary heat and enclosure confirmed if the shell is unheated
  • Containment for saw slurry and dust near stored product
  • Rack teardown and reinstall scheduled against our pour dates
  • Drains, pit locations, and conduit stub-ups marked from current drawings
  • A truck route and washout location that does not cross receiving
  • A written flatness target and who verifies it

The dock approach takes a load nothing else on the property takes

A parked trailer drops its landing gear onto two small steel pads. That concentrates tens of thousands of pounds into a few square inches, same footprint, several times a day. Ordinary drive-lane thickness does not survive it, and the failure is predictable: cracking that starts under the landing gear and works outward.

So the approach gets built heavier and stiffer than the drive that feeds it, with reinforcement sized for the point load and slope that carries water away from the building instead of into the pit. The pit needs square, plumb walls and a leveler frame angle set flat, because a frame shimmed into position never quite seats.

Drainage is the quiet one. Water standing at a dock face freezes, and freeze and thaw at a joint edge is how approaches come apart from the outside in.

You can tell how an approach was built by standing on the leveler while a loaded trailer pulls its landing gear up. Either it is quiet or it is not.

Site superintendent, commercial slab crew

Pads: the two that get sized wrong most often

Dumpster pads fail for a boring reason. They get sized to the container instead of to the truck. The front axle and forks land ahead of the box, so the pad has to run out far enough to catch them and take a fully loaded lift on a hot afternoon. Where the property has to keep wash water out of a storm drain, add a curb or a sloped containment edge, and confirm what applies with your local jurisdiction.

Equipment pads are a different problem. A compressor, a chiller, or a unit at grade wants mass beneath it and separation around it so vibration does not travel through the building slab into occupied space. That means an isolation joint at the perimeter, anchor bolts set from the equipment shop drawing rather than a catalog cut sheet, and conduit and drain stub-ups placed before anyone calls for concrete. Coring a missed penetration through a pad full of steel is nobody's favorite line item.

Industrial Floors & Docks

What facility and operations managers ask us

Still unsure about something?

Call the crew at (303) 569-4046 and we will talk it through.

Yes, with temporary heat and enclosure, and we would rather price that properly than gamble on a warm week. Concrete has to hold temperature while it gains strength, and a cold slab finishes badly and cures slowly. Ground heaters, blankets, and heated batch water all help. We never place on frozen subgrade.

Foot traffic in a day or two, light rolling loads after about a week, full loaded lift-truck service at 28 days. Joint filling lands near the end of that window on purpose, since the slab needs to finish most of its shrinking first. Those dates go in writing so operations can plan around them.

Almost always. Joint repair is its own scope: saw out the broken shoulders, clean to sound concrete, patch with a material rated for wheel traffic, then refill full depth. Done bay by bay, it fits into weekends. Replacing a floor because its joints failed is the expensive answer to a cheap problem.

It depends on lift height and aisle width, so ask your equipment supplier what tolerance their trucks need before you write the spec. Wide-aisle operations rarely need more than a standard tolerance. Very narrow aisle and high-bay racking need a defined-traffic floor, which changes both placement method and cost.

Regularly. Saw cutting and placement get scheduled around dock activity rather than the other way around, and we would rather split a floor into more, smaller pours than block a receiving lane. Send your inbound schedule with the bid request and we will build phasing against it.

Yes, and that is how most occupied buildings do it. We take one position out of service, demo and rebuild, then move down the wall while the rest keep working. The tradeoff is more joints and more mobilizations than a single pour. Usually worth it to keep shipping.

We do, and it needs planning before the pour rather than discovery through a failed coating. A vapor retarder under the slab, a sensible water-cement ratio, and a curing method compatible with the coating all matter. Tell us the coating system early and we will match surface prep to it.
Where We Work

Floors & Docks Across The Front Range

Keep Looking

Other Commercial Work

Finished concrete project at a Colorado home

Bidding Floors & Docks This Season?

Send drawings or a site address and we will walk it, mark the scope, and return a written per-unit breakdown.