(303) 569-4046 Serving Denver & the Front Range Licensed, Bonded & Insured
Go Denver Concrete
Patios & Outdoor Living in Colorado
For Homeowners

Residential Patios & Outdoor Living

Usable outdoor rooms: patios, kitchen bases, spa pads, and the footings that hold shade structures up.

What We Pour

Every Service In This Phase

Pick the project closest to yours. Each page covers what it costs to build right, how long it takes, and what it needs from you afterward.

A patio is the only concrete on a house that people sit on. That sounds obvious until you follow it out. A driveway holds a car and sheds water. A patio has to fit a table and chairs, sit where the sun is tolerable in August, hold a spa full of water without tipping, and dry fast enough after a storm that nobody is toweling off furniture.

We build the whole outdoor room across the Front Range: the slab, the base under a grill island, the pad under a hot tub, the piers under a pergola, and the shell of a water feature.

Size it around the furniture, place it around the sun

Most patios that get rebuilt were not built badly. They were built too small, or in the wrong spot. Twelve by twelve sounds generous on paper and vanishes the moment you set a table with four chairs that need room to slide back.

Then look at where the sun lands. West-facing concrete above 5,000 feet is punishing from mid-afternoon to sunset, and no amount of good finishing changes that. South-facing surfaces clear their own snow and stay usable months longer. East-facing patios go cold early. So we walk the yard and ask which hours you actually want the space, because the answer often moves the slab ten feet or turns a pergola into the thing that makes the patio work.

What sits on it decides what goes under it

Five things people build on a patio, and why they are not the same pour
FeatureWhat the load really isWhat that changes below grade
Open patio slabPeople, furniture, snow4" over compacted base, mesh or fiber, joints cut the day of the pour
Outdoor kitchen baseA masonry island, stone counter and appliances in one rigid lineThickened edge or a footing under the run, steel tied into the slab
Hot tub padA filled spa plus occupants, concentrated on a small footprint5-6" thick, rebar grid, base compacted in lifts, no joint under the shell
Pergola or shade structureWind uplift and overturning, not just weightPiers below frost depth, anchors set while the concrete is still wet
Concrete pond or water featureWater pushing out, soil pushing inReinforced walls and floor working as one shell, waterproofed inside

Water leaves the patio, or the patio feeds it to the house

Every patio we pour slopes. Roughly a quarter inch of fall per foot, always running away from the foundation. But tipping the slab is only half of it. A patio that drains beautifully into a flowerbed six feet from the house has just moved the problem underground.

The bad version is common. An old patio settles back toward the wall, snowmelt pools along the siding, and the clay against the foundation cycles wet and dry until something in the basement tells you about it. So we shoot grades across the whole area, not just the patio footprint, and we account for the roof. Sleeving a downspout under the slab during the pour costs almost nothing; retrofitting one means cutting up the patio you just paid for.

Decide these before we set forms

  • Which hours of the day you want the space usable, so we can place it against the sun
  • Whether a spa is coming now, later, or never, since the pad gets poured for it either way
  • Where the water goes after it leaves the slab, roof runoff included
  • Whether shade structure posts land on the slab or on their own piers
  • Anything electrical or gas that has to be sleeved through before we pour
  • Finish and color, since sealed decorative work wants resealing every two to three years
Bring us the yard and the wish list

We will paint the layout on the grass, walk the sun angles with you, and put a written price in your hands. No charge, no obligation. (303) 569-4046.

Frost is why the pergola sits on piers

A slab can float. A structure tied to the ground cannot. Anything with posts carrying a roof, or a heavy masonry column at an outdoor kitchen corner, wants a footing starting below the frost line. Confirm that depth with your building department before anybody digs.

Water in the soil freezes, expands, and lifts whatever sits in the frozen zone. A four inch patio slab rises a little and settles back and you never notice. A pergola post on a shallow block lifts unevenly until the frame racks and the fasteners work loose. Set the piers deep, cast the anchors into wet concrete rather than drilling later, and the structure stays square. Same logic for a masonry grill island: block and stone are rigid and unforgiving of a slab that moves at one end.

1/4"of fall per foot, away from the house
5-6"of slab under a filled spa
2-3years between reseals on decorative work
28days before the heavy stuff goes on

A pond is a tank, not a patio with a hole in it

Tanks fail at the joints. So we pour the floor and walls to act as a single shell wherever the design allows, keep the steel continuous through the corners, and use a waterproofing system rated for constant contact rather than a general purpose sealer. Anything that will hold fish also needs cure time and a pH neutralization step first, because fresh concrete turns water strongly alkaline.

Freeze and thaw is the other half. Water freezing inside a closed shell puts real pressure on the walls, so the design has to account for how it gets drawn down or run through winter. It is much easier to build a pond you can drain than to explain a split wall in March.

Patios & Outdoor Living

Patio questions we get every spring

Still unsure about something?

Call the crew at (303) 569-4046 and we will talk it through.

Plan on roughly sixteen feet in each direction for a dining zone. A round table with four chairs eats about ten feet on its own, and everybody needs three feet behind them to stand up. Add a grill or a seating group and you want a second zone rather than one bigger square.

Yes, and it is far cheaper to handle now. A filled spa with people in it concentrates heavy load on a small footprint, so that area wants five to six inches of concrete over base compacted in lifts, rebar through it, and no control joint under the shell. Sleeving conduit during the pour is nearly free.

Color matters more than texture. A light gray or tan surface runs noticeably cooler than a dark stain on an August afternoon at this altitude, and a broom finish gives you grip when the surface is wet. For stamped work in a hot exposure, we push the color lighter than the sample board suggests.

No. We put an isolation joint between the slab and the foundation so the two can move independently, because they sit on different support and they will not move together. Without it the patio either pushes on the foundation wall or cracks against it. The joint gets a compressible filler and a sealant on top.

Sometimes. If the existing slab is thick, sound, and sitting on good base, posts can be anchored to it. More often we core through at each post location, pour a pier down below frost depth, and patch around it. That keeps wind uplift and seasonal movement out of the frame. We can tell you which applies once we see the slab.

A properly reinforced shell with a waterproofing system rated for constant water contact does not need one behind it. What it does need is cure time and a pH neutralization step before anything lives in it. We also design around how you will draw it down through winter, since water freezing inside a closed shell is what splits walls.

Walk on it after a day or two. Patio furniture is fine at about a week. Hold off on anything genuinely heavy, a filled spa, a stone island, a loaded dumpster, until day twenty-eight, when the concrete has reached full design strength. You get the timing in writing along with first-winter care instructions.
Where We Work

Patios Across The Front Range

Keep Looking

Other Residential Work

Finished concrete project at a Colorado home

Ready To Start Your Patios Project?

We measure, check drainage and soil, and hand you a written number. No charge and no pressure to book.