HOA & Property Programs in Colorado
For Property Managers, GCs & Boards

Commercial HOA & Property Programs

Multi-year replacement packages priced per foot and phased around residents.

Scope

Everything In This Scope

Each line below is a scope we bid, schedule, and pour ourselves. Open one for specifications, sequencing, and the questions worth asking before award.

A board almost never starts with concrete. It starts with an email. Somebody caught a toe on a raised joint near the mailboxes, or a resident sent photos of the walk behind one of the buildings, and suddenly there's an agenda item with no number attached to it.

What turns that into something a board can manage is an inventory. Not a bid on the one panel that generated the complaint, but a written count of every linear foot of walk, slab, and curb the association is responsible for, each one rated and each one assigned a year. We build those lists for communities across the Front Range, then pour against them one phase at a time. Here's how the program comes together.

The inventory comes before the bid

A crew walks the property with a measuring wheel, a straightedge, and a camera. Every joint gets checked for vertical displacement, every panel gets a condition rating, and slopes get checked where an accessible route runs. The output is a spreadsheet: footage by area, panel counts, dated photos, and a recommended action per location.

That does two things a stack of bids can't. It shows the board the size of the whole problem instead of the size of this month's complaint, and it gives the next board something to inherit. Directors turn over. A dated survey doesn't.

How a condition rating turns into a work order

The logic we apply panel by panel during a community survey
What the survey findsWhat we recommendWhen it lands
Hairline cracking, joints flushLog it, photograph it, leave itRe-check at the next survey
Vertical offset under a quarter inchLog it with a measurementWatch list, no work order
Offset roughly a quarter to a half inch, panel soundGrind the high edge to a bevelSame season, often same week
Offset over a half inch, panel intact, base settledLift the panel back to gradeNext scheduled phase
Panel cracked into pieces or badly spalledRemove and replaceNext scheduled phase
Water ponding or running toward a buildingReplace and correct the slopeMove up the list

Why bulk footage prices differently than one panel

Boards get sticker shock from single-panel quotes, and they should. A crew showing up for eleven feet of sidewalk carries the same mobilization as a crew showing up for four hundred: the saw, the skid steer, the dump trailer, the disposal run. Spread across eleven feet that overhead is brutal. Spread across four hundred it nearly disappears.

So four small calls a year cost meaningfully more than one scheduled phase covering the same footage, and panels clustered along a single building run cheaper than the same count scattered around the property. Retaining walls, court slabs, and structural flatwork aren't footage work at all. We scope those on their own.

1:12maximum running slope on an accessible ramp
1:48maximum cross slope on an accessible route
36"minimum clear width on that route
60"landing dimension at a turn or a door
Want the inventory before you want the price?

We'll walk your property, rate the flatwork, and hand your board the list and the photos. No charge, no obligation to schedule a single panel.

Phasing the list against reserve funding

Very few associations can fund the whole list in one year, and most shouldn't try. The usual structure is three to five phases, worst conditions first, each phase grouped geographically so the crew works one area cleanly and residents everywhere else aren't disrupted at all.

We'll hold pricing structure across a multi-year program where we can, and we're straightforward when material costs move, because a board surprised in year three stops trusting the plan. Between phases we re-survey. Concrete keeps moving on this clay, and panels graduate from the watch list to the work list. Put the phase map and the completed panel list into the association's permanent records after each cycle.

Resident notice and access, handled before we mobilize

  • A written notice the association can send, with dates, scope, and a phone number
  • Door hangers on any unit whose walk or driveway is affected
  • A marked alternate route, kept accessible, whenever we close a walk
  • Barricades and tape set at the end of each work day, not just during it
  • Truck parking worked out with the manager in advance
  • Trash and mail day noted so we don't block a service the property depends on
  • Cure times posted on site: off it 24 to 48 hours, no vehicles for seven days

The complaint panel is almost never the worst one on the property. It's just the one somebody happened to trip on. That's why we walk the whole thing before we quote anything.

Go Denver Concrete crew lead

Matching new panels to flatwork that's already twenty years old

Boards ask about this more than anything else, so here's the honest answer. A new panel dropped into an old walk will not match on day one. Fresh concrete cures light and keeps shifting shade for months, while the existing walk has decades of sun and traffic on it. That contrast fades. It doesn't vanish.

What we do control is everything structural to the look: panel size, joint spacing, joint type, and the direction of the broom finish. Lining those up matters more to the eye than color does, because a mismatched joint pattern reads as wrong forever while a light panel just reads as new. On decorative flatwork around pools and clubhouses we'll get finish and color as close as the current product line allows, and we'll say so beforehand if the match will be approximate.

Settle ownership early too. Responsibility for a given walk can split between the association, the municipality, and the individual homeowner. Check your governing documents, and confirm anything in the public right-of-way with the local jurisdiction before the board authorizes work on it.

HOA & Property Programs

Questions boards ask us

Still unsure about something?

Call the crew at (303) 569-4046 and we will talk it through.

Yes, and that's how most of our community work is structured. We scope the full inventory once, then break it into phases the board funds year by year. We hold the pricing structure across the program where we can and tell you plainly if material costs shift. Between phases we re-survey, because panels move and the priority order changes.

That depends entirely on your community, and it isn't something anyone can answer from the curb. Responsibility can sit with the association, with the municipality, or with the homeowner, and it sometimes splits between them along a line described in your documents. Check your governing documents first, and confirm anything in the public right-of-way with your local jurisdiction.

We're not insurance advisors, so ask your carrier and your association attorney what they want to see. What we can say is that a dated, photographed inventory with a funded phase plan attached shows the association identified conditions and acted in a documented order. Boards tell us that record is easier to produce than a folder of one-off invoices.

Sometimes, and it depends on scope and jurisdiction. Replacing a panel in kind is treated differently from rebuilding a route or a ramp. We flag slope and width problems on the survey so the board knows they exist, then tell you to confirm what triggers an upgrade with your building department before the scope gets locked.

The panel is usually poured within a day or two of demolition, and foot traffic stays off it for 24 to 48 hours after that. Call it three to four days from tear-out to normal use on a typical walk. Driveway panels need seven days before a vehicle rolls on them, and that's the number that drives parking coordination.

Yes, with notice. Give us the irrigation map, or have the landscape contractor mark heads and lateral lines before we mobilize, since saw cutting along a walk edge will find them otherwise. Tree roots are the other common one. Where a root lifted the panel, we'll talk through options rather than cutting something that keeps a mature tree alive.

Late spring through early fall is the comfortable window, and early fall is often best: warm days, cool nights, and runway to gain strength before hard cold. We'll pour in cold weather with heated water, non-chloride accelerators, and blankets when a board needs it. We won't pour on frozen ground for any deadline.
Where We Work

HOA Programs Across The Front Range

Keep Looking

Other Commercial Work

Finished concrete project at a Colorado home

Bidding HOA Programs This Season?

Send drawings or a site address and we will walk it, mark the scope, and return a written per-unit breakdown.