Buy the corner house and you inherit two frontages, a ramp, and twice the walk to keep sound.
Not every house on the block owes the same amount of sidewalk. A mid block lot has one straight run and that's the end of it. The corner house has two frontages meeting at a ramp. The place across the street has a drive crossing carrying a loaded truck twice a day. Same street, same weather, three different jobs.
So a sidewalk call starts with us at the curb, working out what kind of frontage this is. Grass strip between the walk and the street, or concrete running hard against the curb: that one difference changes what fails, how quickly, and what putting it right involves. It changes the number too, which is why two neighbors get different quotes for what looks like identical work.
Set the walk back behind a planting strip and it lives a softer life. Plow spray lands on turf, and the slab gets a shoulder of soil holding both edges. But that's where the street tree lives, and roots follow water and air, which puts them right under the panel.
Run the walk tight against the curb and it becomes part of the street. Everything the plow throws stays on it. Brine draining off the pavement sits at that seam. The outside edge has nothing but the gutter holding it, so when the base washes out, the edge breaks away in a long strip.
Around Olde Town and the older stretches near West Woods we spend most of our time on root conflicts and settled panels. Out through Candelas and Whisper Creek it's long community runs where the ground moved over utility trenches after the neighborhood went in.
A public walk has to shed water without tipping a wheelchair or a stroller. So the slope across the width stays under a strict limit, the slope along the run stays gentle, and the two have to work together while still draining. Get greedy with cross slope to solve a drainage problem and the panel fails an inspection you're paying for twice.
We shoot grades before the forms go down, then check again with a level before anyone calls the plant. A quarter inch over four feet separates a section that gets signed off from one that comes back out. Right of way work generally needs the city's blessing, and those requirements are theirs, not ours. We build to what the inspector measures.
| Frontage | What fails first | What the replacement involves |
|---|---|---|
| Walk set back behind a planting strip | Roots lifting one panel, plus settlement on the wet side of the run | Careful root pruning, base rebuilt below the panel, slope reset across the full width |
| Walk poured tight against the curb | Surface scaling from brine and a broken edge along the gutter line | Full depth replacement, air entrained mix, the street edge supported before we pour |
| Corner lot with a ramp at the intersection | The landing, the slope through the turn, and the warning surface | Ramp geometry rebuilt to current standards with detectable warning panels set in place |
| Panel where a driveway crosses the walk | Cracking under vehicle load when the section is no thicker than the rest of the run | Thicker section, steel through it, joints set so the drive and the walk move separately |
| Long common area run in a newer community | Dips over utility trenches and fill placed during development | Sections ranked by hazard, base recompacted, phased so the path stays open |
We'll walk the frontage with you, mark the genuine hazards, note what can hold another season, and write it up. (303) 569-4046.
Your sidewalk gets treated harder than any other concrete you own, and most of that happens between December and March. Plow blades pass within inches. Brine drains off the street and pools at the low edge. Every neighbor with a bag of ice melt uses your frontage as a test strip. A lifted panel that was merely annoying in October becomes the thing a blade catches in January.
Spring through fall is the working season, early autumn easiest of all. Panel work does happen in the cold when a hazard can't wait, protected under blankets, though frozen subgrade stops us. If a section is a real trip hazard in December, call anyway. Sometimes a temporary asphalt wedge is the honest answer until the ground opens up.
Corner lots are their own animal. Two runs, a ramp, and slope that has to work in three directions at once. More time with the level than with the trowel.Straight from the crew
Still unsure about something?
Call the crew at (303) 569-4046 and we will talk it through.
Get a free, no-obligation estimate from a crew that knows Colorado soil, Colorado weather, and how to finish concrete that lasts.
Accessibility
Adjust the site to fit how you read and browse. Your choices are saved on this device.