Two placements a day apart, sleeves set while the trench is still open, and a mason who never has to core anything we poured.

The concrete under an outdoor kitchen is the cheapest line on the whole project and the only one nobody can fix later. Countertops get replaced. Grills get swapped out every decade. A stone island that has settled an inch toward the yard is a demolition job, and the reason it settled is almost always something that took twenty minutes on pour day.

Here's how a build actually runs at your house. Two separate placements, usually a day apart, and a short list of decisions that have to be locked before the first one. We form and pour footings under wherever masonry is going, then come back and pour the working slab that ties it all together. Nothing about it is exotic. It's just done in an order that a lot of patio crews skip.

The morning before any truck is ordered

We start with chalk and a can of paint, and we want the appliance list in hand. Not the brand, the footprint. A thirty-six inch grill head, a side burner, an under-counter fridge with a specific cutout, and a sink if there's a sink. Those dimensions set where the footings land, and the footings have to be under the masonry, not near it.

Then we mark the working side. There's a lane in front of the island where somebody stands with tongs for two hours at a stretch, and that lane needs to be flat, drained away from the house, and wide enough that a chair behind the cook isn't in traffic. On tighter Old Town lots this is where the whole layout gets decided, because the space simply doesn't allow a full wraparound. Out toward Harmony and Registry Ridge, where yards run bigger, the constraint is usually the gas line route rather than the footprint.

Last thing before we call for concrete: utilities. Gas sleeve, electrical sleeve, and a drain line if the plan has a sink. Every one of those goes in while we can still reach it. There is no cheap version of that step done later.

While the concrete is going in

Footing day is fast and unglamorous. We dig, set the forms, tie steel that will lap into the slab, and place. The concrete goes below frost depth wherever masonry sits on it, and we keep the tops clean and screeded so the mason has a true surface to lay the first course on. Then it sits overnight while it takes an initial set.

Slab day is the one you'll want to watch. Base gets compacted and dampened, the vapor and drainage details get checked one final time, and steel goes on chairs. When the truck backs in, we place from the far corner and work toward the exit, screeding to the fall we marked so water leaves the cooking area rather than pooling under your feet. We bull float, wait for the bleed water to leave, then float and broom. That waiting stretch looks like nothing is happening. It's the most important twenty minutes of the day, and finishing during it is how a surface ends up dusting a year later.

Joints get cut the same day, laid out to line up with the island edges rather than wandering across the middle of the standing area. Then we cover, cure, and hand it off. The mason typically starts about a week out.

Three separate placements, one build

Why the concrete for an outdoor kitchen doesn't all arrive at once
PlacementWhen it happensWhy it can't just be combined
Footings under the masonryFirst, once layout and appliance sizes are finalThey need to bear below frost depth, deeper than any slab section
Thickened edge at the island linePoured monolithic with the slab where a footing isn't requiredCarries lighter framed islands without a separate dig
Working slab and standing areaSecond placement, usually the following dayNeeds its own screed grade for drainage, independent of the footing tops
Sleeves for gas and powerSet before either placementCoring a cured slab damages steel and never lands where you wanted it
Countertop support padsWith the slab if the design calls for themThe mason builds up from there, so elevation has to be set in concrete
Patio tie-inLast, after the kitchen concrete has taken a setGets an isolation joint so the two can move independently
4"slab in the standing and traffic areas
12"thickened edge where masonry lands on slab
4,000 PSIair-entrained exterior mix
24 hrsbetween footing day and slab day
Have a design but no idea what goes underneath it?

Bring us the appliance cutsheets and a rough layout. We'll mark footings and sleeves before anybody spends money on stone.

The list we walk before calling for the truck

  • Appliance cutouts confirmed against the actual model numbers, not a rendering
  • Gas sleeve stubbed and capped, run located and flagged
  • Electrical sleeves in for outlets, lighting, and anything that plugs in under the counter
  • Sink drain and supply set if the plan has water, with a shutoff you can reach in October
  • Island footprint painted on the ground so you can stand in it and object before it's permanent
  • Fall set away from the house across the whole standing area
  • Joint layout drawn to follow the island lines rather than cut through the cooking lane
Fort Collins Outdoor Kitchen Bases

Outdoor Kitchen Bases in Fort Collins

Still unsure about something?

Call the crew at (303) 569-4046 and we will talk it through.

Two working days for the concrete on most residential builds, spread across three calendar days. Layout and footings the first day, slab the second, with a morning in between for the footings to set. We're not underfoot after that. The mason usually starts about a week later once the slab has taken enough strength to work off.

Below the frost line for anything carrying masonry, and we confirm the local requirement before we dig rather than guessing from the last job. A stone or block island is a permanent dead load sitting on a small footprint. Put that on a shallow pad and the first few winters will tell you about it through the grout lines.

How much masonry is planned, because stone and block need real footings while a framed island with light cladding often doesn't. After that: excavation depth, how far concrete has to be moved by hand to reach the backyard, how many utility sleeves are involved, and the finish on the standing area. Access is the sneaky one.

Late spring through early fall. Air-entrained concrete wants overnight lows above freezing while it gains strength, and this far north that window closes sooner than it does south of us. September is our favorite month for it. If you want to cook out there next summer, starting the concrete in fall gives the mason and the appliance lead times somewhere to live.

It stains it. Grease and marinade soak into unsealed concrete and go dark permanently, which is why we seal the standing area with a penetrating sealer and suggest refreshing it every two or three years. Wipe spills the same evening, keep a mat under the cook if you're serious about it, and skip harsh degreasers on decorative finishes.

Depends on what's under it. If the masonry sits on a slab that settled, we can sometimes lift it and stabilize the ground. If it was built on a thin pad with no footing at all, the honest answer is that it needs to come apart and be rebuilt on something real. We'll dig a test hole at one corner and tell you which one you have.

The concrete itself is usually straightforward, but a gas line and any permanent electrical are the parts that typically involve inspection, and your licensed trades will handle that side. Check your HOA for anything visible over a fence line or attached to the house. We photograph and document the finished work so your submittal is easy to put together.
Finished concrete project at a Colorado home