(303) 569-4046 Serving Denver & the Front Range Licensed, Bonded & Insured
Go Denver Concrete
Shed & Outbuilding Pads in Aurora, Colorado
Aurora, Arapahoe County

Aurora Shed Pad and Outbuilding Slabs

The first hard downpour of July tells you everything about how your outbuilding is sitting.

A July storm builds over the mountains, crosses the metro in twenty minutes, and drops more water on your back yard than the whole month before it did. Watch what happens to the shed. Roof water sheets off the low edge, hits bare dirt, and starts digging. Some of it runs under the door. By August there's a shallow trench along one wall and the plywood at the bottom of the door has gone dark.

That's the argument for a real pad, and it has little to do with the concrete being flat. It's about the building sitting above the water instead of in it. We pour outbuilding slabs across Aurora on every kind of ground there is, and the ones that stay square are the ones where somebody thought about a rainstorm before the shed arrived on a trailer.

What a wet spring does to a building sitting on dirt

Summer storms are dramatic. Spring is what moves things. Snow piles against the north wall through February, a warm week turns it to water all at once, and the ground under the shed stays saturated for weeks. Wood in contact with that wicks it up. Blocks and skids press into softened soil, one corner further than the rest, and the door that latched fine in October needs a shoulder.

Then it freezes again, lifts whatever is sitting on it, and thaws. Run that through a season and a building racks out of square a fraction at a time. Nobody notices the process. Everybody notices the roof line the year after.

Sizing the slab to the building, not the box it came in

Two schools of thought, and we have a favorite. Pouring exactly to the shed footprint puts the wall right on the edge of the concrete. Looks tidy. It also means every drop off the siding lands on dirt against the slab edge. A few inches larger gives the walls a shoulder to sit on and gives water somewhere to land and leave.

So we go bigger, and when there's room we go bigger on one side on purpose. Four extra feet across the front turns a shed door into a working threshold. Roll the mower out without dropping a wheel off the edge. Park the wheelbarrow while you dig for a trowel. Stand somewhere solid in March. That front apron is the cheapest concrete on the job, because the excavation and the truck are already there.

Where the water comes from, and what it does

Four sources of trouble around an outbuilding, and how the pad answers each
Water sourceWhat it does to the buildingHow we handle it
Roof runoff off a gutterless edgeCuts a trench along the wall, splashes dirt up the sidingSlab set proud of grade, fall carried away from the wall
Snow drifting off a fence into the north sideKeeps that side wet for weeks and rots the bottom plateExtra width there plus a graded shoulder to shed melt
Yard runoff arriving from uphillUndermines the base and pushes silt under the doorA shallow swale upslope so it never reaches the pad
Sprinkler overspray on the wallsConstant damp at the base, staining on the slabMove the heads, set the edge clear of the pattern
4 inslab for a typical storage building
5 inwhere a tractor or a lift lives inside
4 inof pad we like beyond the wall on each side
2 inof slab standing above the finished grade
Shed already ordered?

Give us the footprint and the delivery date. We'll tell you whether that schedule works.

Anchors, frost, and unheated buildings

Wind is a real load out here and a light shed is a sail. We set anchor bolts into wet concrete at the corners and along the wall lines, laid out from the plan you hand us. Cleaner and stronger than drilling wedge anchors into cured concrete later. If the building arrives already assembled we can still drill and epoxy. We'd rather set them.

Frost is the question people ask sideways. An unheated building sits on ground that freezes deeper than the ground under your house, since no warmth leaks down through the floor. For most storage sheds a well built slab on drained base handles that, because the whole thing rises and settles together if it moves at all. Larger structures, real foundation walls, or anything that has to stay dead level for equipment get a different build with footings below frost depth, and we'll say so on the walk.

April through October is easy. Late September is ideal, since the pad cures before a building lands on it and before the winter you're trying to solve shows up. Winter pours happen with blankets and heated water, though a small slab loses heat fast and the ground has to be thawed. In Murphy Creek and Sterling Hills, where back yards run flat and hold water, we'd rather wait out a wet week than pour into a puddle.

What goes into an outbuilding pad

  • Layout squared to the fence or the house so it reads straight from the deck
  • Sod and topsoil stripped and hauled, not tilled in and buried
  • Compacted base at a depth matched to the ground we find
  • Grade shaped so runoff leaves on the downhill side
  • Mesh or bar sized to what's going inside
  • Air-entrained mix, tooled edges, broom finish for wet-day grip
  • Anchor bolts set wet, laid out from your building plan
  • Joints cut the same day on anything past a small pad
Aurora Shed Pads

Shed Pads in Aurora

Still unsure about something?

Call the crew at (303) 569-4046 and we will talk it through.

Tell us the delivery date first and we'll work backward. The pad wants a few days before anyone sets a building on it, longer if the delivery involves a truck driving across the slab or a forklift setting it. Rolling a shed on skids over a pad at four or five days is usually fine. Heavy equipment waits.

It does, and it's the most common reason one corner drops. That pile is a water delivery system aimed at the same spot every year. We build the pad wider on that side, carry the grade away from the wall, and where the drift is bad we suggest a gutter and a short extension to move the melt somewhere useful.

Above it. We aim for a couple of inches of slab standing proud of finished grade, dirt sloped away from the edges. Flush pads collect everything the yard sends them, and a shed at lawn level takes water at the door every spring. The step up is small enough that a mower rolls over it.

Not that first winter, and go easy after. Magnesium chloride is hard on young concrete and it pits the surface right where you walk most. Sand handles traction fine. Longer term, a penetrating sealer once the slab is fully cured gives the surface a fighting chance against whatever tracks in on boots.

Usually. The expensive part of this job is getting a crew and a truck into your back yard, so added square footage is the cheapest line on the estimate. Pouring later means a second mobilization, a cold joint against the existing slab, and a color difference you'll notice. If the lean-to is a maybe, add it now.

Depends on the building. Some can be jacked, skidded aside, and set back down on the new slab, which we've done with a couple of extra hands. Others come apart faster than they move. Either way it has to be off the footprint before we excavate, so tell us early and we'll plan the sequence.

We pour outbuilding slabs deep into fall and do winter work when it's warranted, using warm mix, blankets, and an accelerator without chloride. Small pads shed heat fast, so protection matters more here than on a driveway. Frozen ground is the hard stop, and a soggy site books first thing in spring.
Finished concrete project at a Colorado home

Need Shed Pads in Aurora?

Get a free, no-obligation estimate from a crew that knows Colorado soil, Colorado weather, and how to finish concrete that lasts.