(303) 569-4046 Serving Denver & the Front Range Licensed, Bonded & Insured
Go Denver Concrete
Mudjacking & Slab Jacking in Larkspur, Colorado
Larkspur, Colorado

Larkspur Mudjacking

Cement slurry pumped under a dropped panel, and a walkway you're pushing a wheelbarrow across by dinner.

The reason most people finally call about a sunken slab isn't how it looks. It's the wheelbarrow. Or the trash cart that wants to tip every Tuesday, or the plow blade that catches the same lip every storm, or the load of firewood you're walking from the truck to the porch across a lip that grabs your boot in the dark. Sunken concrete is a daily nuisance long before it's a hazard.

Mudjacking hands that surface back to you fast. We core a hole pattern through the panel, force a dense sand-and-cement grout into the cavity below it, and ride that pressure upward until the slab reads level. Nothing gets demolished. Nothing needs a month of curing before you use it. You're back on the concrete you already own, most often the same day.

1-3/4"core hole for the grout hose
2-3 hrstypical time on a single dropped panel
100 lbper cubic foot, roughly, of cured slurry
Same afternoonyou're walking it again

What slurry is and why its weight is the whole conversation

The material we pump is a screened sand, portland cement, and water grout, blended thick enough to hold a load and loose enough to run sideways into every pocket of the void. It cures into a hard pad and stays there permanently. That permanence is the selling point. It's also the constraint.

Grout is heavy. Filling a washed-out cavity with something dense is exactly right when the soil below is competent and all you lost was the fines that rain carried off. It's exactly wrong when the panel dropped because the dirt underneath is soft and overloaded already, since you'd be piling more weight on the thing that gave out. So the first hour of any lift out here is diagnosis, not pumping. We probe, we look at where roof and hillside water goes, and if slurry is the wrong tool we say so and talk about foam or a rebuild instead. Larkspur lots make that call more often than metro lots do, because a lot of these pads sit on cut-and-fill benches carved into a slope.

What goes back on a lifted slab, and when

Real timelines for what people actually do on their concrete
Back in serviceHow soonThe reason
Boots, kids, dogsOnce the patches trowel up stiff, usually a couple of hoursFoot loads spread wide and the grout is already carrying the slab
Wheelbarrow, garden cart, trash binSame dayA narrow wheel is still a small load next to the panel itself
Passenger car or half-tonNext dayGives the grout column overnight to firm under a rolling tire path
Loaded trailer, propane truckAbout a weekConcentrated axle weight is worth waiting on
Snow shovel and plow bladeNext stormThe lip is gone, so the blade rides through instead of catching the joint
Pressure washing and sealingTwo weeksLets the patch mortar cure fully before it takes water and sealer
Tired of the lip that catches everything?

We'll shoot grades, tell you how far the panel dropped, and quote the lift. No charge, no folder left behind.

How lift day runs on a wooded Larkspur lot

  • We walk the route first and figure out where the rig parks and how far the hose has to reach
  • Grades get shot with a laser so the target is a number, not somebody's eyeball
  • Hole pattern gets laid out to spread pressure across the panel instead of concentrating it
  • Cores drilled, spoil vacuumed up, nothing tracked over your flagstone or into the pines
  • Grout pumped in stages while a second set of eyes watches the joint line rise
  • Pumping stops the instant the panel reads level, because pushing past level cracks concrete
  • Holes packed, troweled flat, and tinted toward the color of your slab
  • Joints cleaned and resealed so the next storm doesn't wash straight back under the fill

Frost, thaw, and picking your month

We pump from the time the ground releases in spring until it locks up in late fall, and at 6,720 feet that window opens later and shuts earlier than it does closer to town. June through October is the reliable stretch. If you get to choose, choose autumn. A panel back at grade before the snow flies sheds meltwater instead of cupping it into a puddle that refreezes overnight and pries the joint another notch wider.

Frozen ground ends the season, and not because we're soft about the cold. A slab locked into frost won't rise evenly no matter how much pressure sits behind it, and grout wants unfrozen dirt around it while it sets. December calls become March appointments almost every time.

Rain counts for less here than it does on a pour, since everything cures out of the weather beneath your concrete. We still stand down during a real soaker. Soaked ground under a dropped panel behaves unpredictably, and a lift made into firm soil is the only kind that stays put.

Larkspur Mudjacking

Mudjacking in Larkspur

Still unsure about something?

Call the crew at (303) 569-4046 and we will talk it through.

A single dropped panel is usually a morning. A run of walkway, or several drive panels, can fill the day. Setup drives the variable out here: how far the hose travels from wherever the rig can safely sit, and whether we're crossing turf or landscape rock that needs protection. We give a realistic window at quote time and would rather overestimate than surprise you at four.

Cured grout runs somewhere around a hundred pounds per cubic foot, so a void that took a few cubic feet of fill has real mass in it now. On competent soil that's a non-issue; you've replaced missing dirt with something stronger. On genuinely weak ground it's a fair objection, and it's why we probe before we pump. If the answer is that your soil can't hold more load, we'll tell you that lightweight foam is the better tool and why.

No. The patches sit flush with the surface, and once they've set they're as hard as the surrounding concrete. What we'd avoid that first winter is dumping chemical ice melt directly on them, since fresh cement paste doesn't love it. Sand gives you traction without the chemistry. And the honest upside of a lift is that your blade stops slamming into a raised joint every pass.

Almost always, and the gap widens the farther you are from the road. Replacing panels out here means demolition, haul-off down a private drive, forms, steel, a ready-mix truck that has to reach the work, and weeks of waiting. Lifting is material and a few hours of labor. We won't quote a figure on a web page, but we'll tell you which panels are worth lifting and which ones we'd let go until you're ready for a rebuild.

Rarely, and we'd rather turn down the work than take a deposit on something that won't come out right. The grout needs ground above freezing and the panel needs to be free to move. Neither is true in January at this elevation. Call anyway in the cold months and we'll put you near the front of the spring list, which fills faster than people expect.

Nine times out of ten around here, water found a path. A downspout emptying in the same spot for a decade, a hillside pushing runoff at the low corner of a pad, or a service trench that nobody compacted and that quietly kept settling. Trees contribute too, pulling moisture from the soil through a dry summer. We chase the source, because grout fills a cavity and does nothing else.

Sometimes, with more planning. Weight on the panel changes how it wants to move, so we tighten the hole pattern, pump slower, and watch the level throughout. Anything plumbed or wired to the structure gets slack checked first. If the pad is undersized for what sits on it, lifting only delays that conversation, and we'll say so beforehand.
Finished concrete project at a Colorado home

Need Mudjacking in Larkspur?

Get a free, no-obligation estimate from a crew that knows Colorado soil, Colorado weather, and how to finish concrete that lasts.