Engineered shells sprayed in place, plus a clear map of what actually moves the number.
Two pools with the identical rectangle on paper can finish a long way apart on price, and hardly any of that gap is the shell. Concrete is one of the smaller pieces of a pool budget. Access, excavation, engineering, plumbing, and everything you build around the water are where the money actually goes.
We build shells, and we'd rather you see the whole picture in month one than get surprised in month three. So this page is about value. What's worth paying for once. What genuinely swings the cost on a Denver lot. And what you can flex on later without touching a single thing that holds water.
Start with access, because in this city it outranks everything. A pool means hundreds of tons of dirt leaving and a shell arriving, and on a Cherry Creek or Park Hill lot the only route is a gate or an alley. Sometimes a conveyor over the fence. Sometimes a hose run a hundred and fifty feet from a truck at the curb. Occasionally hand digging the last few feet where no machine fits. That labor dwarfs the price gap between one shell design and another.
After access comes the ground and what the engineer says about it. Then plumbing, equipment, and electrical, which multiply quietly every time somebody adds a jet or a heater. Then the deck and the safety barrier, which people forget to budget and which often cost more than they guessed. Finish materials land last, and that's the right order, since plaster and tile are the only part you can adjust without touching structure.
| Driver | Why it matters | How far it moves things |
|---|---|---|
| Getting to the hole | Every yard of spoil out and concrete in passes through your gate or over your roof | The biggest variable on an infill lot. It can double excavation and placement labor alone. |
| Soil and the engineer's answer | Bearing conditions set wall thickness, steel, and whether you need hydrostatic relief | Large, decided before the first shovel, and not negotiable. |
| Depth and shape | Deep ends mean more dirt, more shell, more water, more heating | Moderate. Curves, benches, and vanishing edges cost more than depth. |
| Plumbing and equipment | Returns, jets, heater, automation, and how far the pad sits from the water | Moderate, and prone to creep. Each feature is one more line in the trench. |
| Deck and safety barrier | Flatwork square footage, finish choice, fence or cover | Bigger than most people plan for. Budget it alongside the pool. |
| Finish materials | Plaster, aggregate finishes, tile, coping stone | Real money, and the last thing to lock. This is your flex without touching structure. |
A sprayed shell goes in against the excavation itself. We tie the steel cage, hang the plumbing, and shoot concrete at high velocity so it consolidates as it lands, then carve and float it to the shape on the plan. One placement, one continuous structure, no cold joints for water to find. Curves, benches, steps, and a beach entry all come out of that same operation.
Cast-in-place is the other route: two-sided forms, concrete poured between them, waterstops wherever one pour meets the next. It has a place on straight walls, simple rectangles, and some retrofits. But you're paying for formwork and accepting joints in a vessel whose only job is to not leak. On soil that moves, we'd rather hand you one monolithic shell.
Send yard dimensions and a few access photos. We'll tell you what the site does to the budget before a designer draws anything.
Excavation and shooting run comfortably from spring into late fall. Cold-weather shoots happen with heated mix, enclosures, and blankets, but the wet cure is the sticking point, since keeping a shell damp for a week is a different exercise when the hose freezes overnight. We'll do it when a schedule demands it. We won't pretend it's simple.
Here's the part that costs money: timing. Break ground in early spring and you're swimming that summer. Start in August and you very likely have a next-season pool, with the shell wintering over while it waits on plaster and fill. That's a schedule, not a disaster, but it's why we tell people in Wash Park, Berkeley, and University Hills to have the design conversation over the winter. Dirt work is the bottleneck, and everything downstream waits on it.
Still unsure about something?
Call the crew at (303) 569-4046 and we will talk it through.
Get a free, no-obligation estimate from a crew that knows Colorado soil, Colorado weather, and how to finish concrete that lasts.
Accessibility
Adjust the site to fit how you read and browse. Your choices are saved on this device.