Polyurethane fills the space your soil gave up, and puts almost no new weight on ground that already quit once.
A settled slab is a story about dirt, not about concrete. Something below compressed, washed away, or was never compacted properly to begin with, and the slab followed it down. So the useful question isn't how far it dropped. It's what occupies that space now, and what put it there.
Polyurethane is good at answering that. The resin enters through a port about the width of a pencil, travels as a liquid, then expands and hardens right where the hollow is. It reaches irregular pockets a heavier material would bridge straight over, it weighs a small fraction of what cement grout weighs, and it's rigid enough to carry the slab within minutes. On ground that has already failed once, adding almost nothing back is the whole argument.
Start with the clay. Adams County soil holds water, changes volume as moisture comes and goes, and does most of the work that ends with concrete out of level. But the clay usually isn't the hollow itself. The hollow forms in whatever sits between that clay and the bottom of your slab.
In Eastlake, that layer is frequently nothing at all. Older flatwork here went straight onto graded soil, so when a moisture cycle pulls the surface down half an inch, the slab loses its bearing and a pocket opens under it. Hunters Glen and Quail Valley usually have some base, but plenty of it went in thin and it went in before anyone thought carefully about where roof water would land. Twenty years of a downspout dumping at one corner will strip the fines out of four inches of road base without any trouble at all.
North Creek Farms and the newer construction north of it have a different underside: trench spoil. Sewer, water, and electrical laterals got backfilled, sometimes in lifts too deep to compact honestly, and that soil keeps consolidating for years. The slab above a trench line settles in a stripe, which is a pattern you can't unsee once somebody points it out.
We can fill any hollow you've got. What we can't do from the hose is stop the water that dug it. So before we price a lift we walk the property hunting for the supply: downspouts letting go right on the concrete, grade that slopes back toward the house, a sprinkler zone that has been watering a walkway for years, a window well that overflows, edge joints that haven't held sealant since the slab was young.
Fix those and a resin lift is effectively permanent, because polyurethane doesn't wash out, doesn't rot, and doesn't compress under load. Skip them and you've bought time rather than a fix. We'd sooner say that during the estimate than have the conversation two winters later.
Something else about our ground up here. Shallow soil moisture moves constantly and the freeze-thaw count is high, so any pocket under a slab gets worked all winter long. Water finds it, freezes, pushes, thaws, drains away leaving the space slightly bigger than before. That's why a hollow that took a decade to form can double in one wet year.
They look alike from the porch and they want opposite fixes. Send photos and we'll sort it out before anybody drills.
| Water source | What it did underneath | How we shut it down |
|---|---|---|
| Downspout letting go onto the concrete | Sheeted under the edge joint and carried fines out with it | Extensions that run past the slab and discharge onto soil |
| Grade falling back toward the house | Kept the subgrade saturated so it squeezed down under load | Regrade that strip, or cut a shallow swale that routes water around |
| A sprinkler head watering the walk | Soaked the most vulnerable edge every single morning | Turn the head, swap the nozzle, or relocate it. Cheapest fix on this list. |
| Open joints and a gap along the foundation | Gave surface water a shortcut straight down the slab edge | Clean the joints out and refill with a flexible sealant |
| A utility trench crossing under the slab | Backfill that kept consolidating for years after the pour | Fill the pocket and watch it. Trench settlement does eventually finish. |
| Snow piled in the same spot each winter | A soak zone at that corner every February | Throw it the other direction. Free, and it works. |
Still unsure about something?
Call the crew at (303) 569-4046 and we will talk it through.
Get a free, no-obligation estimate from a crew that knows Colorado soil, Colorado weather, and how to finish concrete that lasts.
Accessibility
Adjust the site to fit how you read and browse. Your choices are saved on this device.