(303) 569-4046 Serving Denver & the Front Range Licensed, Bonded & Insured
Go Denver Concrete
Residential Foundations in Denver, Colorado
Denver, Colorado

Denver Concrete Foundations

Every era of Denver house left something different in the ground, and we build for the one you actually have.

Denver didn't get built all at once, and you can read that history in the concrete. A Washington Park bungalow may be riding on a hand laid stone perimeter somebody set about a century ago. A Park Hill four square might have thin poured walls with no steel in them anywhere. Berkeley has both, plus a scrape off going up next door on a lot the same fifty feet wide.

We pour new foundations across all of it. Replacements under standing houses, addition footings that have to behave like the hundred year old work they bolt to, and full basements for infill builds where the excavator barely fits between fences. Our structural engineer is on our payroll, so whoever sets footing width and steel schedule is the outfit that has to build it.

What each generation of Denver house left in the ground

The oldest houses in the city sit on mass, not on engineering. Stone or brick perimeter walls, no reinforcing, a shallow footing, and drainage that consists of hope. Between the wars, poured walls showed up. Better in principle, still unreinforced, still with no drain at the footing. Postwar ranches brought block stem walls over narrow footings. Then a long stretch of nothing, and now infill: engineered walls, drain tile, damproofing, radon sleeve, a stamped set for the whole package.

That spread matters because most of our work in the old neighborhoods isn't a tidy new build on empty dirt. It's surgery. Shoring a standing house while we replace a wall in bays. Park Hill and Washington Park send that job constantly. Central Park sends the clean version, with drawings.

Foundation systems by build era

What we tend to find under Denver houses, and what it takes to build with it or replace it.
VintageWhat's usually holding it upWhat we end up doing
Turn of the century bungalowHand laid stone or brick perimeter, no steel, shallow bearingUnderpin in sections, or rebuild the wall in bays while the house stays shored
Between the wars two storyThin poured wall, unreinforced, no drain at the footingNew reinforced wall and a real drain once the trench is open anyway
Postwar ranchBlock stem wall on a narrow footing, crawl space behindRepair or replace the block, then fix the moisture that chewed it up
Nineties through the two thousandsPoured and reinforced, damproofed, drain tile in placeUsually sound. The calls come from additions and from grade somebody changed
Current infill buildEngineered walls, void form where the soils report asks for itFull new pour off a stamped set, on a lot with nowhere to put the dirt

What goes in the hole before any truck backs up

  • Bearing surface checked against the soils report, not against how the dirt looks that morning
  • Footings cut below frost depth and stepped where the grade forces a step
  • Void form under grade beams when the soils engineer wants somewhere for heaving ground to go
  • Steel tied and chaired to the drawing, laps measured instead of eyeballed
  • Forms braced hard, because a blowout on a narrow city lot ruins more than the pour
  • Anchor bolts and hold downs set while the concrete is wet, never drilled in later as a patch
  • Damproofing, drainage board, and perforated drain in washed rock before a single bucket of backfill
Building, adding on, or replacing a wall under an old house?

Send the plans, or just the address. Our engineer will tell you what the foundation has to do before you get locked into a design. (303) 569-4046.

Fifty foot lots, big machines, and the neighbor eight feet away

Access decides more about an infill foundation than anything printed on the drawing. On a standard old Denver lot the machine has one way in, the spoil pile has nowhere to sit, and the property line sits close enough that the neighbor's garage joins the discussion. So we plan the dig as a logistics problem first. Where trucks stage. Where dirt goes. Which day the block gets tight.

Shoring is the line item nobody budgets and half these jobs need. Cutting to full basement depth beside a standing structure means that sidewall has to be held, by benching it back where there's room or shoring it where there isn't. You'll hear that from us in week one, in writing.

4,000 PSIair entrained mix in the walls and the footings both
#4bar tied on chairs, laps measured to the drawing
28 daysto full design strength, and the schedule respects it
5,280 ftelevation, where the daily freeze cycle does the damage

The pour calendar in a city that freezes every night and thaws by noon

Foundation work runs later into the year than flatwork does. A wall down in a trench is protected on both faces, and the mass carries its own heat while it sets. We place walls into November and December most years with heated mix water, non chloride accelerator, and blankets over the forms.

What stops us is frozen bearing. A footing set on frost is set on something that won't be there in March. And Denver's real trouble isn't deep cold anyway. It's the swing. Forty five and sunny at two, nineteen before dawn, over and over. That cycle punishes fresh concrete and it punishes an open excavation. Break ground in spring if you can. If you can't, say so early and the cold weather plan goes in the bid.

Denver Foundations

Foundations in Denver

Still unsure about something?

Call the crew at (303) 569-4046 and we will talk it through.

It's a cardboard form set under grade beams and footings that collapses on its own over time, leaving an air gap between concrete and soil. On ground that heaves, that gap gives the dirt somewhere to go besides straight up into your floor joists. Whether you need it comes out of the soils report for your specific lot, not from a rule of thumb. Our engineer reads that report and sizes the void to match.

Usually, with planning. Smaller machines, material staged off site when the drive won't hold it, and a dig sequenced so spoil leaves the same day it comes out. We walk the route first: gate widths, overhead lines, where a pump truck can set up, which neighbor deserves a heads up. Access shapes the price on these lots, so we price it honestly at the start rather than discovering it later.

Depends on how much of the wall is still doing its job. A stone perimeter with one failed bay and solid bearing everywhere else is a repair, and a good one. A wall shedding mortar along its whole length, with no drain and no steel, is a money pit dressed up as a repair. Our engineer tells you which one you own.

Later than most people expect. We place into December in a normal winter, because the wall lives in the ground where conditions hold steadier than the air above it. The hard no is pouring onto frozen bearing surface, so we thaw and protect the ground or we wait. Digging frozen clay also runs slow, which means a winter start costs schedule even when the pour itself goes clean.

Two foundations at two different depths, on soil whose volume changes with moisture. Older footings here often sit shallower than current practice, so if the addition went in deeper on undisturbed ground, the two halves answer a wet spring differently. The crack shows up at the seam. The fix is getting both sides bearing on material that behaves the same way.

Water discipline, mostly. Run downspouts past the backfill zone instead of onto a splash block sitting right over the trench. Keep grade falling away on all four sides, including the cramped one along the fence. Move spray heads off the wall. Backfill keeps settling for a couple of seasons, so throw soil into any low spot before it turns into a pond against your concrete.
Finished concrete project at a Colorado home

Need Foundations in Denver?

Get a free, no-obligation estimate from a crew that knows Colorado soil, Colorado weather, and how to finish concrete that lasts.