Newer house, moving steps. Those two go together far more often than anybody expects.

Half our step calls start the same way. The house isn't old. Nothing else on the property is misbehaving. But the stoop feels wrong underfoot, a dark seam has opened where it meets the brick, and the bottom step is taller than it used to be. Homeowners assume they've found a foundation problem. Usually they've found a backfill problem, and those are different conversations.

The newer side of Aurora produces plenty of these. Southshore and Saddle Rock are full of houses where flatwork went in on a builder's schedule, over ground that had been dug out, piled back, and driven on weeks earlier. The house sits on real footings and stays put. The stoop sits on that fill, and fill keeps giving for years.

The trench around a new foundation never fully goes away

Picture the construction sequence. A hole gets dug wider than the house, walls go up inside it, and the dirt gets pushed back against them. Nobody compacts that in careful lifts the way we'd compact a base, because framers show up Monday. The ring of loose material runs around the whole building, and the front entry sits on top of it.

Water finishes the job. Roof runoff and spring melt soak straight into the looser dirt, packing it and carrying fines off. The stoop follows it down. The house doesn't, so you get the gap at the top tread, then a bottom step reading taller than the rest, then a slab tipped enough to run water back at the door.

Entry types around town and what each one needs

Different front doors, different failures, different builds
Entry typeWhat usually goes wrongWhat we build
Short stoop on a newer buildSinks into perimeter backfill, gap opens at the topFootings below frost, cage tied through landing and risers
Raised porch with a full flightUneven risers and a rail post loose in its pocketFormed to a story pole, anchors cored and epoxied
Side flight down to a walkoutHolds ice for weeks, treads spall from the edges inWider treads, pitched to drain, heavy broom for grip
Steps off a deck to the yardStringers left hanging over a pad that droppedLanding on compacted base, sized past the stringer feet
Short run into a garden-level doorWater collects and freezes against the thresholdDrain detail at the base, slab pitched out and away

The story pole, and why every riser has to match

Your foot learns a staircase in two trips, then stops paying attention. That's why one riser off by a fraction is dangerous out of proportion to its size. Your brain already committed to where the next surface would be.

So the flight gets set off a story pole before a form goes down. Total rise measured from finished landing to finished walk, divided into equal parts, then checked against the door threshold so you aren't left with a tall step at the top. Residential code caps riser height a bit under eight inches, wants treads deep enough for a whole foot, and is strict about the risers in a flight matching. Your building department has final say and we build to it.

Steps moving on a house that shouldn't have problems yet?

Common call, not a scary one. We'll look and tell you whether it's the entry or something bigger.

1/4 inthe most variation we'll accept across a flight
36 intypical minimum depth we dig footings to for an entry
6%entrained air in every mix that touches a tread
2 daysof no front door on a typical rebuild

Treads take the worst winter on the property

Nothing else you own takes this combination. A tread is flat, so meltwater sits on it. It's thin and exposed on three sides, so it cycles through freezing faster than a driveway does. And it's where the first scoop out of the ice melt bag lands in January. That's why tread edges crumble before anything else.

Air entrainment is the answer, every set, no exceptions. Those tiny bubbles hand freezing water a place to go instead of letting it force the surface apart. From you we ask one winter of restraint: sand, a plastic shovel, magnesium chloride left in the garage.

Work runs April through October, September being the best stretch we get. Footings dig easily and a long mild run follows for curing. Winter rebuilds are doable: blankets, warm mix, an accelerator carrying no chloride. Cutting footings out of frozen ground is slow, though, and the price says so.

Included when we rebuild an entry

  • Tear-out and haul-off, plus whatever loose fill turns up below
  • Footings taken past frost depth and checked before any steel drops in
  • One tied cage running through the footings, the risers, and the landing
  • Forms built off a story pole so no riser reads different from its neighbor
  • Each tread canted out a hair, because nothing should stand on a step
  • Air-entrained mix, edges tooled by hand instead of ground down later
  • Broom texture worked across the walking surface for wet-day grip
  • Rail anchors cored and set in epoxy wherever your fabricator needs them
  • Sides packed back in lifts, with the finished dirt running away from the work
The newer the house, the more surprised people are. We pull the old stoop and find no footing at all, just a slab poured on the same dirt that came out of the hole. It was never going to stay level. Took a few winters to show.Straight from the crew
Aurora Steps & Stairs

Steps & Stairs in Aurora

Still unsure about something?

Call the crew at (303) 569-4046 and we will talk it through.

Because the steps aren't sitting on the same ground the house is. Perimeter backfill gets replaced fast during construction and it keeps settling for years afterward, especially where roof water soaks it. The house sits on footings and stays put. Anything poured on that fill goes down with it. Common on new builds, and it's fixable without touching the foundation.

Yes, and the small ones are exactly where they get skipped. Height has nothing to do with it. What matters is that the concrete bears on ground that doesn't heave, which means below frost depth on undisturbed soil. A short stoop poured on backfill will move the same way a tall one does; it just has less distance to travel before you notice.

Quite a bit. Side flights sit in shade most of the winter, collect roof melt from above, and in a house with a finished basement they see more traffic than the front stoop. We build those treads deeper, pitch them harder so nothing stands, and run a heavier broom. Handrail placement gets more attention too.

A broom pulled across the direction you walk gives solid traction wet or dry, and that's our default on treads. Want more? We can add a nosing texture, or a sealer with grit in it once the concrete cures. What we avoid outdoors is a smooth trowel finish. Sharp on day one, hazard on the first icy morning.

Usually, and we'll say when it's a bad idea. Sound walk at a sensible elevation, we tie in with an isolation joint and leave it. If the walk dropped along with the steps, rebuilding one leaves a lip at the bottom tread, which is the hazard you're paying to remove.

Less than people fear. Demo and forming need working room along the sides of the entry, a spot on the drive for a haul-off trailer, and somewhere the truck can reach with a chute or buggy. We protect the lawn along the route and put the grade back at the end. Sprinkler heads get flagged before anybody digs.

Fall, if you can manage it. An entry finished in October has all winter to weather in, so it doesn't read as brand new concrete beside older flatwork in the listing photos. It also takes the safety question off the table before showings. If fall has passed, early spring still beats waiting; the calendar fills fast once the ground thaws.
Finished concrete project at a Colorado home

Need Steps & Stairs in Aurora?

Get a free, no-obligation estimate from a crew that knows Colorado soil, Colorado weather, and how to finish concrete that lasts.